Steps to debug belt conveyer

- Apr 03, 2018 -

1. after installation, the belt conveyor is carefully debugged to meet the drawing requirements.

2. the reducer and the moving parts are filled with the corresponding lubricants.

3. after installing the belt conveyor to meet the requirements, each single device is manually operated and tested, and combined with the commissioning of the belt conveyor to meet the requirements of action.

4. debug the electrical part of the belt conveyer. It includes regular electrical wiring and action debugging, so that the equipment has good performance, to achieve the design function and status.